Condo boards in Miami-Dade and Broward deal with three programs that overlap: the milestone inspection Florida law requires for condo and co-op buildings, the Miami-Dade recertification that many owners still call the 40 year recertification, and Broward's building safety inspection. Each one ends with a report from an architect or engineer, and the facade, where the stucco is, is one of the things that report looks at. This guide covers the rules, the stucco and facade items in those reports, and the order the work should happen in.
What Florida Statute 553.899 requires
The statute covers residential condominiums and cooperatives that are three habitable stories or more in height. The first milestone inspection is due by December 31 of the year the building reaches 30 years of age, and then every 10 years after that. The local building official can move the first one up to 25 years when local circumstances call for it, and the statute names "proximity to salt water" as one of those circumstances. That clause is worth knowing if your building faces the water in Miami Beach, Hollywood or Pompano Beach.
Buildings that reached 30 before July 1, 2022 had an earlier deadline: their first inspection was due before December 31, 2024. Smaller residential buildings are left out. The law exempts single-family, two-family, three-family and four-family dwellings with three or fewer habitable stories above ground.
The inspection is done by an architect or engineer licensed under Florida law (chapters 481 and 471). It has two parts:
- Phase one is "a visual examination of habitable and nonhabitable areas of a building." It has to be finished within 180 days after the association receives the building department's written notice.
- Phase two is required only "if any substantial structural deterioration is identified during phase one." It can include destructive or nondestructive testing at the inspector's direction, and it ends with repair recommendations.
Two more deadlines shape the board's calendar. Within 45 days of receiving the report, the association has to give every unit owner the inspector's summary, post it in a conspicuous place on the property, and publish the report and summary on the association's website if it is required to have one. And under the local ordinance the statute calls for, repairs from a phase two report "must be commenced within 365 days after receiving such report."
Miami-Dade: the 40 year recertification became 30
Miami-Dade had its own recertification program well before the state law. Older county notices cite Section 8-11(f) of the Miami-Dade County Code and ask owners to show the building is "structurally and electrically safe." That program started at 40 years, which is where the name comes from.
In a 2023 presentation for design professionals, the county building department said Miami-Dade "reduced the inspection cycle from 40 to 30 years." A few points from that presentation matter to owners:
- It reaches past condos. "All other buildings" recertify at 30 years and every 10 years after, so a rental apartment building or an office building can be on the list too.
- Condos and co-ops three stories or taller within 3 miles of the coastline recertify at 25 years, under the county's rule as it stood in 2023.
- Single-family homes, duplexes, and minor buildings of 2,000 square feet or less with an occupancy load of 10 or less are exempt.
Broward: BORA Policy 05-05 at 25 years
Broward runs its program through the Board of Rules and Appeals. Policy #05-05, the Building Safety Inspection Program, took effect August 9, 2024. Buildings are inspected once they "reach 25 years of age or older," counted from the date the certificate of occupancy was issued, and again every ten years. The policy calls for a structural and electrical inspection by a "Florida licensed professional," and it says the program counts as both phase one and phase two of the state milestone inspection.
The exemptions are one- to four-family dwellings with three or fewer habitable stories, fee simple townhouses, and minor structures under 3,500 square feet. The policy also reaches "elevated decks, balconies, docks, and seawalls if attached to or supporting any structure." Its text does not single out stucco or the facade, so how a facade crack gets written up in Broward depends on the professional doing the inspection.
Where stucco and facade items show up
Miami-Dade's recertification guidance lists the structural elements an inspector reviews. Three of them touch the outer skin of a stucco building:
- "Building façade (cladding, appurtenances, and other appliqués)"
- "Windows and doors (leaking, connection, frame)"
- Columns, beams and slabs, with spalling, cracks and excessive deflection called out
The county report also has a Section 12, "Building façade inspection." The county describes it as a category used only on threshold buildings and meant for items on the facade that can detach. On a mid-rise that could be a loose band of stucco trim or a decorative piece over a window.
In plain terms, the stucco items are cracks, hollow or loose areas, stains, and gaps around windows and doors. Spalling is a different item. It is concrete breaking away from rusting steel, and it belongs to the engineer and a structural repair scope. Our guide to concrete spalling vs stucco cracks explains how to tell them apart.
The "surface imperfections" language
Boards often ask whether cracked stucco will push the building into phase two. The statute answers it directly. "Substantial structural deterioration" "does not include surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes," unless the engineer or architect determines they are "a sign of substantial structural deterioration."
So a cracked stucco wall, on its own, does not count against the building under the statute. It still needs repair. Florida's hurricane retrofit guide notes that a hairline stucco crack 6 inches long and 1/64 inch wide lets in as much water as a square hole a little over 1/4 inch across, and that wind-driven rain during a storm can soak block walls for hours. Builders' engineering guidance also says a crack with "significant vertical displacement" may indicate a structural concern. Sorting a cosmetic crack from a warning sign is the inspector's call, which is one more reason the report comes first.
Order of operations: report first, repairs second
- The notice arrives. The building department sends the association written notice. Phase one has to be done within 180 days of it.
- Hire the architect or engineer. They do phase one, and phase two if they find substantial structural deterioration.
- Share the summary. Within 45 days of receiving the report, unit owners get the summary and it is posted on the property.
- Turn the report into a repair scope. Ask the engineer to separate structural repairs (concrete, steel, connections) from finish repairs like stucco and coatings. Structural work has its own permit rules. Miramar, for one, requires plans signed and sealed by a professional engineer whenever structural repair is part of a stucco permit.
- Get quotes for each part. Structural repairs go to a contractor who can pull that permit. Florida does not license stucco work: Statute 489.117 lists "stuccoing" and "plastering" among job scopes a local government may not require a license for, so a local stucco contractor can quote the stucco portion of the report on its own.
- Start on time. Repairs from a phase two report have to begin within 365 days of receiving it.
- Coatings go last. Stucco is patched and cured before paint or an elastomeric coating goes on. See painting stucco in South Florida.
Following this order means nobody patches and paints a wall that the structural crew has to open again a month later.
What to send with a stucco quote request
- The pages of the engineer's report that mention the facade, stucco, cracks or windows, plus any marked-up elevations or photos
- The address, the number of stories, and which sides of the building are affected
- How the walls can be reached: from the ground, from balconies, or only with scaffold or a lift
- Your deadline from the report or the building department
Send it through the contact page or call (954) 371-2314. A local stucco contractor reviews it and comes out to measure. For the kind of work involved, see condo and commercial stucco restoration and stucco crack repair, or the Miami-Dade County and Broward County pages. Hablamos español.
Questions
Is the 40 year recertification still required in Miami-Dade?
The county shortened it. A 2023 Miami-Dade building department presentation says the county reduced the inspection cycle from 40 to 30 years, with condos and co-ops three stories or taller within 3 miles of the coastline at 25 years. State law (Florida Statute 553.899) also sets the first milestone inspection for condo and co-op buildings at 30 years.
Does a single-family home need a milestone inspection?
No. Florida Statute 553.899 exempts one- to four-family dwellings with three or fewer habitable stories. Miami-Dade's recertification exempts single-family homes and duplexes, and Broward's BORA Policy 05-05 also exempts fee simple townhouses.
Will stucco cracks fail our milestone inspection?
Cracks alone are not "substantial structural deterioration" under the statute, which excludes surface imperfections such as cracks and peeling finishes unless the engineer or architect decides they are a sign of deeper deterioration. They still let water into the wall, so most boards fix them along with the report's other items.
Can South Florida Stucco Repair do our milestone inspection?
No. The inspection and report come from an architect or engineer your association hires. Once you have the report, send us the pages about the facade and stucco and we connect you with a local stucco contractor to quote those repairs. Call (954) 371-2314 or use the contact page.